The wall pavilion of the Zwinger Palace in Dresden was built at the beginning of the 18th century. The pavilion, which has a ballroom on the upper floor and a vestibule on the Zwinger courtyard level with flights of stairs giving access to the Zwinger ramparts, was completely refurbished.
The colour scheme, floor coverings and windows of the ballroom were retained and restored. Targeted objectives were put in place to improve energy efficiency. To help achieve these measures, SG 4960 roller blind systems were selected to manage daylight through individual and group control.